2121 Interbay Drive
Wednesday, March 10, 2010
Desk Top Plunge Cut
Plunge cut desk top so the tambour curtain will unlock desk drawers.
Tuesday, March 9, 2010
Main Drawer Finished
Drawer set and fits in the roll top.
Leigh Doug Fir and Cedar
One large pickup load of rounds. All split and stacked today. Workers loaded the truck while we waited.
Friday, February 12, 2010
Trimmed Branches
Trimmed tree branches off the backyard tree. Scored firewood. Before picture.
Saturday, January 30, 2010
Los Gatos Eucalyptus
One pickup load of Eucalyptus wood.
Wednesday, January 27, 2010
Harwood Los Gatos Eucalyptus
Pickup load of some gigantic branches at Harder and Blossom Hill road area.
Sunday, January 24, 2010
Los Gatos Oak
Picked up two loads from a huge oak tree in Los Gatos. The tree fell down after the ground was saturated from all the rain in January.
Saturday, January 16, 2010
Cupertino Oak Branch Wood
One huge oak branch to fill up a pickup truck.
Wednesday, December 30, 2009
Sunnyvale Doug Fir
The ad said cedar but we think it's Douglas Fir.
Sunday, November 15, 2009
Stacked Split Madrone
Stacked and split madrone.
Friday, November 13, 2009
Scotts Valley Madrone
Two pickup loads of madrone with a little bit oak.
Wednesday, November 11, 2009
East SJ Ornamental Pear
East SJ Ornamental Pear
Two truck loads. Enough to fill a rack. Ruined two chains because of rocks in crevice of a large piece of wood.
Wednesday, August 12, 2009
8 Foot Tomato Ripening
The first 8 foot tomato is beginning to ripen.
Garden Expands
The ever expanding garden and growing sunflowers. Before and after.
Almaden Eucalyptus
Friday, July 3, 2009
Sunnyvale Pittosporum-Atlas Cedar-Deodara
Sunnyvale Pittosporum, Atlas Cedar and Deodara firewood.
Thursday, June 18, 2009
Egg Plant - Artichoke
Latest tasty veggies.
More Top Soil
Two little truck loads of Cambrian top soil.
Wednesday, June 17, 2009
Willow Glen Mystery Wood
Maybe almond?
Tuesday, May 12, 2009
New Air Conditioner Installed
Old AC unit removed and new unit put in place on Saturday. Monday added 110v outlet and secured the unit. Tuesday added framing to seal the garage site. Still need to add wide molding around unit in the house.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)