Started job at 1:03pm and finished this stage at 4:00pm.
Removed the following from the 1986 Toyota Truck 22R manual engine with carburetor.
1. Radiator removed including 4 x 10mm bolts and 4 x 12mm bolts. All bolts in a baggie labeled radiator. Note the coolant system needs to be flushed. Brown sludge on the bottom of the radiator that was replaced less than one year ago.
2. Clutch fan removed and 4 x 10mm nuts in new water pump box.
3. Crankshaft bolt. Attached socket to breaker bar and cranked motor to loosen. See picture.
4. Set timing chain. Put yellow marks on spark plug wires of two and three.
5. Disconnected battery and pulled spark plugs.
6. Top dead center.
7. Distributor removed.
8. Removed alternator. Bottom bolts are 14mm.
9. Remove the rubber cooling system hose.
10. Removed air conditioning compressor, bracket, belts and alternator. Note the a/c bracket has over 9 bolts to remove.
11. Removed thermostat inlet.
12. Removed water outlet to water pump.
13. Water pump removed.
14. Removed tow 12mm oil pan bolts.
15. Broke loose bolt holding distributor and removed drive and cam gear.
Followed instructions from http://www.4crawler.com/4x4/CheapTricks/EngineMods/TimingChain.shtml
22R Timing Chain Replacement Instructions.
2121 Interbay Drive
Wednesday, January 25, 2012
Tuesday, January 24, 2012
Little Truck - New Timing Chain
Friday, November 4, 2011
Replaced Malibu Rear Window Regulator
Heard a loud pop when lowering the rear window driver's side last Sunday. Knew it was the window regulator and thankful it was a nice day. Received the replacement regulator today and installed in about 90 minutes. A good portion of the time was getting the duct tape off the window with 'Goof Off' and a razor blade. 2001 Chevy Malibu.
VIDEO: How to Replace Rear Window Regulator Chevy Malibu 97-03
VIDEO: How to Remove/Install Rear Door Panel Chevy Malibu 97-03
Wednesday, November 2, 2011
Tuesday, August 16, 2011
New Meter Installed and Stucco Painted
Panel installed July 29th by Steve Brooks of South Bay Home Improvement. Stucco completed on August 5th. Painted on August 16th by verdej. 200 AMP Square D panel. Passed city inspection.
Wednesday, July 20, 2011
Los Gatos Lexington Madrone & Oak
Thursday, July 14, 2011
Electric Meter Socket & Load Center
Electric Meter: Bryant MS-125
- Needs the load socket and bus bar replaced
- Aluminum Wires from Main
Load Center: Main Breaker Needs to be Replaced
- Model BR-2100 100AMP
Horizontal Service Box
- Outdoor, recessed wall box, and underground utilities.
- Width = 14 3/4"
- Height = 12"
- Depth = 3 3/4"
Home Built
Early to mid 1970's.
Indoor Garage Wall Panel
- Height 15 1/4"
- Width 15 7/8"
All breakers made by Bryant
Green = BR-130
Blue = 15AMP
Red = 20AMP
Black = 15AMP
Grey = BR-140
Click on any picture to view larger image.
Friday, June 24, 2011
NASCAR - Infineon Sonoma Cup Qualifying
First time at Sonoma (Sears Point) Infineon Raceway to watch practice sessions and qualifying for Sunday's cup race. First rate facility with great access to parking, restrooms, food, beer and access to all of the NASCAR action. Made my day with a 'little bit of Monica in my life' at the Sprint booth.. eat your hearts out!
Monday, April 11, 2011
ChemTrails - San Jose Blossom Valley
Wednesday, April 6, 2011
Friday, May 21, 2010
Thursday, May 13, 2010
Wednesday, May 12, 2010
Tuesday, May 11, 2010
VIDEO Roll Top Sealing Pullouts
First attempt at sealing the two pullouts on the second roll top desk. Posted our first video of this ongoing project here on my Youtube channel here...
Friday, April 16, 2010
Wednesday, March 10, 2010
Subscribe to:
Posts (Atom)